The Los Angeles Unified School District ( LAUSD) 's Musical Instrument Repair Workshop received an Academy Award in 2025 for the story film “The Last Repair Shop.” LAUSD contracted SuperBox Events to build an extension to this facility, which is located in the Downtown Facility.
The Los Angeles Unified School District ( LAUSD)
NEW 20’ STANDARD HEIGHT CONTAINER
DOORS REMOVED
REAR WALL REMOVED
ROLL UP DOORS INSTALLATION BOTH ENDS
FULLY INSULATED
LIGHTING
ELECTRICAL SPECIALIST SYSTEM
SPECIALIST HVAC SYSTEM
STEEL EXTRA SECURE MAN DOOR
2 X SLIDING WINDOWS
REPAINTED
EPOXY FLOOR
Project Build Information
NEW 10FT CONTAINER
DOOR REMOVED
ROLL UP DOOR
FULLY INSULATED
LIGHTING
ELECTRICAL
SPECIALIST HVAC SYSTEM
REPAINTED
EPOXY FLOOR
FULL LOGISTICS SERVICES
BUILD TIME 14 DAYS
COMPLETED APRIL 2025